PDF Viewing Options

Not Your Device? Search For Manuals or Datasheets below:


File Info : application/pdf, 4 Pages, 2.18MB

Document DEVICE REPORTFLC3 ROhousing IS0755 0
id+ 3.5" round housing
FLC3D | FLC3W

LUMINAIRE MUST BE INSTALLED PRIOR TO DRYWALL CEILING. ALL GRID LUMINAIRES MUST BE SECURED TO STRUCTURE ABOVE.

- - non emergency thermally protected, non-ic

optional
bar hangers sold separately

key power off

power on

FLC3D | FLC3W
- emergency remote test switch, non-ic

ic/cp

attention
level
see additional instructions

WALL WASH ORIENTATION

WALL

FLC3D | FLC3W

FLC3D | FLC3W

KEEP SHADED AREA FREE FROM OBSTRUCTION ABOVE CEILING

SHORT CONE DNS
SUPER SHORT CONE
DSS

2.64" .50"

10.61" 10.61"

TALL CONE 3.16" DNT
.50"

FOR ASTM E-283 AIR-TIGHT COMPLIANCE, SEAL IC HOUSING/ RO TRIM WITH SILICONE CAULKING BETWEEN THE EDGE OF THE COLLAR AND CEILING MATERIAL. SEAL ALL ADDITIONAL HOLES IN HOUSING
WITH ALUMINUM TAPE.

IS0761 REV. B

Luminaires must be installed by a qualified electrician (check with local and national codes for proper installation). To prevent electrical shock, disconnect electrical supply before installation or servicing.
2022 ©Focal Point, LLC 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com

1 of 4

1

4 1/8"
ceiling cutout

GRID - 1/2" CONDUIT & CLIP (BY OTHERS)

2 X2

3

GRID - BAR HANGERS (SOLD SEPARATELY)

2 x2

3

4b multiple luminaires only

4 x4 4a x4

IS0761 REV. B

Fixtures must be installed by a qualified electrician (check with local and national codes for proper installation). To prevent electrical shock, disconnect electrical supply before installation or servicing.
2022 ©Focal Point, LLC 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com

2 of 4

DRYWALL - BAR HANGERS WOOD STUDS
2a x4

2b x4

METAL STUDS
3
x4

4

5

minimum ceiling thickness: 1/2"

maximum ceiling thickness: 1-1/2"

EMERGENCY - REMOTE TEST SWITCH

1

2 Ø 4.125"

make electrical connections
ABOVE CEILING ACCESS REQUIRED
3
7.304" ± 0.25"

141

release test switch from bracket
prior to installation

5.246 ± 0.58"
5

3.187 ± 0.58" Ø 0.75"
6

IS0761 REV. B

adjust test switch until canopy is flush with ceiling

BATTERY UNIT CONNECTOR INSIDE

Fixtures must be installed by a qualified electrician (check with local and national codes for proper installation). To prevent electrical shock, disconnect electrical supply before installation or servicing.

2022 ©Focal Point, LLC 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com

3 of 4

171
SEE BATTERY MANUFACTURER INSTRUCTIONS
DRIVER SERVICE

EM- MOUNTING HEIGHT

DO NOT MATE BATTERY UNIT CONNECTOR
UNTIL INSTALLATION IS COMPLETE AND A.C. POWER IS SUPPLIED

SEE BATTERY MANUFACTURER INSTRUCTIONS
emergency maximum mounting height: DOWNLIGHT: 21.4' WALL WASH: 16.1'

1

2

TO PREVENT ELECTRICAL SHOCK, DISCONNECT ELECTRICAL SUPPLY
BEFORE SERVICING

Contractor is responsible for adequately reinforcing walls and/or ceilings to support fixture weight. Focal Point, LLC accepts no responsibility for inadequately reinforced walls and/or ceilings. The information contained in this drawing is the sole property of Focal Point, LLC. Any reproduction in part or whole without the written permission of Focal Point, LLC
is prohibited.

IS0761 REV. B

2022 ©Focal Point, LLC 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com

4 of 4


Adobe PDF Library 16.0.7 Adobe InDesign 17.3 (Macintosh)

Search Any Device: